Building Inspection:

Electrical Rooms 

Inspection Check Monthly

Superviser, Joint Health & Safety Committee

South Side

1) Locks on doors working properly?
2) Door is locked and key holder list present?
3) Lighting in area is adequate?
4) Electrical panels are closed, not locked?
5) Electrical room is free from debris?
6) Electrical recepticles are free from damage?
7) All material secure/safely put away?
8) Are there any flammable liquids in room?

North Side

1) Locks on doors working properly?
2) Door is locked and key holder list present?
3) Lighting in area is adequate?
4) Electrical panels are closed, not locked?
5) Electrical room is free from debris?
6) Electrical recepticles are free from damage?
7) All materials secure/safely put away?
8) Are there any flammable liquids in room?
9) Is Exit door accessible?
10) Is Exit door able to open without any outside obstruction?

Further Monthly Instruction

a) Has water been poured into floor drain?
b) Air/Water gauge readings?

Should you note any discrepancies or deficiencies please note and forward required repairs or modifications to maintenance via FreshDesk.